COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS ANO DATES:
98-509
FS-271
7E508
ATOMIC ENERGY COMMISSION
z SANTA FE OPERATIONS OFFICE
2/5/51
(3/23,
ie
51
AG
PS=173-3
ee
JOB NO.
a
51
CONTRACT NO,
640 - Le
_AT={ 29~1 1-507
Papstiaine No.:
og _23
*Not for use by A-E
LOCATION EBNGEBRI ISLAND - SITE "g*
DATE OF THIS REPORT:
23 March 1951
640 <1 *. For: The
¢Complete Construction of Fresh & SaltWater Systens,scaltFat
t Fater
|Well &
Suction
Water Towers, Acid Tank Bldg., and Temporary Di
Plant
-
2/13/51
640 = 64,
sHeet wO.__28
Sdete.
:
,
92, 105, 120, and 202
ESTIMATE
“Property
Account
Quantity
DESCRIPTION OF PROPERTY UNITS
Unit
Construction
Contract
Est'd. Value
GOVE aeerrapned
En
gineerin
9
Cost
Total
SALT WaTER SYSTEM
Salt Water Piping System - Outdoor - Pipe, 4" Transite; pressure 150#; underground 2'-6" minisum; 1,410 lin. ft. Pipe, 3" Transite; pressure 150#; underground 2'-6" minimum; 200 lin. ft. Services, water ~ copper pipe; 6 each: 1 1/h",
k2' average length, 3 each, and 1", 202' average length, 3 each.
SALT WATER WELL AND SUCTION PIPING = Adjacent to the power and water distillation
it, a
.
eep
cover is provided with piping, foot valve,
and fittings which lead to the pumps in the power plant. The well 0.D. 5'.0" x
5'-0" x 16'-]" 42 of reinforced concrete with seepage slots in the lower section.
2
Systen
Direct
Indirest
$6,153.06
4, 358.07
$254.56
$10, 765.69
FRESH WaTER SYSTEM
Fresh Water Piping System - Outdoor - Pipe, 4" Transite, preseure 150, under2'-6" minimm, 1,110 lin. ft.; Pipe, 3" Transite, pressure 150%, uander—
2' a6"
minimus,
380
lin.
It.
Pipe,
i"
Steel,
SO lin. ft.) Services, water-—- copper pipe, 12 eacht
SO
lin.
fto3
PY
_
2°
Steel,
4 each - 11/4", average
55 feet; 3 each - 1", average 110 feet; 5 each - 3/1", average 52 foete
TEMPORARY DISTILLATION PLANT -
«
Systen
1
Each
Direct
$7,223.17
$202
Thies is a one story, wood frame, shed roof, corrugated aluminum covered, canvas
siding, erected on a 5" thick concrete slab, size 20'-0" x 0'-0", floor area
800 square feet, complete with electric wiring and fixtures, fresh and salt
water piping, fresh water pontoons, fresh water tank, 25'-O" diameter x §'-0*
high, pusp and fuel of] pontoon on platform. Installed equipment includes:
Three distillation units, and one pump.
*
1
+
Cost included in Distillation Equipment
TOTAL - Distillation Equipsent
Located in Bldgs. #100 & 202
Direct
Indirect!
$113,086.62
3h,266.4)
$117,373.06
Contimed on Next Page
verde documen
mah
S
- *T
Fe
T
GL,
the Nations: Per
triapmine py ort
in aby mawner t
prokibited and
penditien uoder
.
Proration
Units
to of
Charges