COMPLETION REPORT FOR
JOB NO.
AS-BUILT DRAWING NUMBERS ANDO DATES:
20-903-2
20-90h-2
20-353-2
16H~626
2/2/51
2/2/51
610 = Se
CONTRACT NO,
For:
2/2/51
2
SHEET NO
LOCATION & BBERIRU GROUP - SITES "D—-V"
Bullding No.: 106 and 110
omer
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
8
or_1)
"Not for use by A-E
AQMON, BILJINI, ROUJOA,
AT-( 29~1 1-507
The Complate Construction of Shop Building and Timber Grease Rack
2/2/51
"Property
Account
S eel”
DATE OF THIS REPORT:
2 February 1951
,
ESTIMATE
Construction
Contract
Est'd. Value
Gove ural shed
Engineering
Cost
Total
$163.37
$14,794.85
*Proration of
Charges to Units
SHOP BUILDING — Bldg. 106
Que story, double roof, prefabricated alumimm structure; rectangular shape;
ise I.D. 2k'-0" x yo'-8 1/2® x 10'-0" mean height; eet on a 5" thick reinforced
concrete slab; vented window panels; light end power wiring and fixtures;
drinking founteain; floor ares 0.D. 1,05h square feet; cubic contents 1.D. 9,937
cubio feet. Benches and gall parts bin.
Installed equipment includes:
t
GREASE
-
Two drille and one saw.
1
Each
Direct
Indirect
$9,619.87
5,011.61
°
Qne grease rack of tisber construction; overall sise at grade level 1,'-0" x
h2'-9 3/4"; two tread ramps rising from concrete pads to elevated planking
5'-5" above grade; tread ramps and elevated planking 2'-0* wide, constructed
of 3" x 6" plankings 3'-3" between ramps which rise through a distance of
20'=6") horisontal elevated planking 22'=3 3/l" in length; 2" x 6" decking on
sills between structures; floor area 69 square feet; Douglas fir tiaber supports,
brecing and planking ebove 6" x 8 redwood sills set on grade.
1
Rach
Direct
Indirect
$556.08
129.77
$687.85
fecting
tec Ite
ten Ls
in abvere
vn te
minal