Byeeh
Fas no.
05014
USER
SCIENTIFIC STATION NO.
JTF-8
FUNDING
AGENCY
AEC
None
($000)
ENGR
~
PRE-GO
Prior Cost 10.9
FY 69
3.5
.-.
PROC
CONST
TOTAL
63.8
.
FURM
74.7
18.4
21.9
whe bheaaah tee eee
TOTAL
‘
14.4 me pt 8262. + 9606
aM grt > Lo
PRIOR YEARS.
_ ¥ BAO heeoa
:
Co OB pe th uP bey me kenign
ewe APL
ENGINEERING
Gompletada ner :
thee mereitn + a4, tg de aie 3
OE ders vu eR |S
bt wee es ‘age
OM
tha. te sre
EiYoe
“
7
9
Drawings: JS 95-37-Al and AZ; ""J$.95-37-SL thruSe” §95-378Lthe
JS 95-37-C1.
oe aS 937M).thay, MB.3a95-37-Ri eg"
va
F
95D -002-<2e;
PROCUREMENT
Completed.
CONSTRUCTION
The rad safe laboratory, located in the southwest corner of
Damon Tract, is a 32 x 50-ft. single story concrete block structure with a con-
crete floor slab. Roofing is built-up and insulated. The masonry wails are
finished with gypsum board. The floor surface throughout is finished concrete.
Height of the suspended acousticalceiling is §-ft. Lighting fixtures are surface
mounted and fluorescente: This: facility, wtil be used for the calibration and repair |
of badges and instrumentecend.{fr trainfiig radsafe personnel.
The building contains ee rad safe aupply (450 SF), entry room (90 SF),
calibration range27 Ons ‘acdST}veedour room (180 SF), darkroom (60 SF), toilet
sae
rie paty Boom (285 SF}.
The darkrog ~
ft. long cou
The entire building is air conditionedand dehumidified by an exterior unit.’
Power supplied to the building ia 120/208 voit, 60 cyele, 3 phase. A fresh
waterline and a sewer line service the building.
service is provided.
(Completed in 1966}
5.94
Fire alarm and telephone
7
VOL Il