29001
HF Communications Simulation Experiment - Subtask A611
USER
STRUCTURE/FACILITY NO.
TC
None
FUNDING
AGENCY
DASA/
RDT&E
SCIENTIFIC STATION NO.
($000)
[13-3-1
ENGR
PROC
CONST
GO+105
TOTAL
FURN
Engineering costs included in F&S Number 21003.
Estimate 12/65
TOTAL
8.3
8.3
8.3
8.3
PRIOR YEARS
ENGINEERING
Drawing:
Completed.
113-002-C]
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
Test Command will furnish two 110-ft. high Log Periodic
Ionospheric antennas, and one instrument trailer.
The contractor will furnish
one 20 kw, 120/240 volt, 60 cycle, single phase, low speed (1250 rpm) diesel
generator for use as a back up power source. Primary power will be provided
from existing military or local sources. Construction will probably be accomplished by a local contractor.
The contractor will perform the following: a) prepare a cleared, flat, 405 x 590ft. unobstructed area for the TC erected 110-ft. high Log Periodic lonospheric
antennas which will have a ground screen that extends into the sea;
b) construct
concrete antenna bases, as designed by TC in the field; c) provide longeron pads
and anchors for the antennas; d) site the instrument trailer; and, e) install the
generator and complete the electrical hookup to instrument trailer. Refer to
Figure A-26, Appendix A, for site location. Four scientific personnel will be
assigned to Subtask A611 at this site.
29-3
_
FOD GO+125
PRE-GO
EAO 11064 POST-GO
4101-61
Bop
VOL II
April 1909