SOON,
VITI LEVU, FIJI
Fa&SNO.
TITLE
27005
Camp
USER
STRUCTURE /FACILITY NO.
SCIENTIFIC STATION NO.
None
None
JTF-8
Bop
FOO GO+120
FUNDING
AGENCY
($000)
ENGR
PROC
CONST
TOTAL
JTF -8/
PRE-GO
CRO 7-65
POST -GO
Estimate 12/65*
210.0
210.0
TOTAL
210.0
210.0
MILCON
FURN
Engineering costs included in F&S Number 22007.
IN ORDER TO MEET THE REQUIRED BENEFICIAL AND FULL OCCUPANCY
DATES AND MAINTAIN AN ORDERLY MOBILIZATION OF OFF-ISLAND CAMP
CONSTRUCTION, PROCUREMENT FOR THE ACCEPTED CAMP CONCEPT
MUST BE ACCOMPLISHED PRE-GO.
PRIOR YEARS
ENGINEERING Plan IIIB Preliminary Drawings - Completed.
Drawings:
93-002-Cl
93-023-Al
93-024-Al
PROCUREMENT
at Damon Tract.
93-043-Al, Ml and El
93-078-Cl
93-095-El and E2
106-002-Cl
TYP-035-Al and A3
TYP-036-Al
Some major items for Plan IIIB type camps are in stockpile
CONSTRUCTION Will be accomplished Post-GO.
POST-GO
ENGINEERING Plan HIB Preliminary Drawings - Completed.
If military
field camp concept is adopted, engineering will be completed in the field, PostGO.
PROCUREMENT Should be accomplished Pre-GO.
CONSTRUCTION A tent camp will be required for billeting and messing
scientific and support personnel. JTF-8 is currently reviewing support
camp requirements and material costs.
*Includes mobilization and demobilization costs based on Plan IIIB concept.
27-7
s oe hie a
VOL II
April 1969