wither|
VITI LEVU, FII
Fa&SNO.
TITLE
USER
STRUCTURE /FACILITY NO.
27002
HF Communications Simulation Experiment - Subtask A611
TC
None
106-3-2
FODGO+125
TOTAL
CONST
PROC
ENGR
($000)
FUNDING
AGENCY
BODGO+105
SCIENTIFIC STATION NO.
FURN
DASA/
PRE-GO
RDT&E
Engineering costs included in F&S Number 21003
EAO 1106-| POST -GO
4101-61
Estimate 12/65
8.3
8.3
8.3
8.3
TOTAL
PRIOR YEARS
ENGINEERING
Completed.
Drawing:
106-002-Cl
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION Test Command furnished items are as follows: a) one 110-ft.
high Log Periodic Ionospheric antenna; and, b) one instrument trailer. The
contractor will furnish two 20 kw,
120/240 volt,
speed (1250 rpm) diesel generators.
up power source.
60 cycle,
single phase,
low
One of the generators is utilized as a back
The contractor will perform the following;
a) prepare a cleared, flat, 265 x 345-
ft. unobstructed area for the TC erected 110-ft. high Log Periodic lonospheric
antenna which will have a ground screen that extends into the sea; b) construct
concrete antenna bases, as designed by TC in the field;
pads and anchors for the antennas;
c) provide longeron
d) site the instrument trailer; and,
e) install
the generators and complete the electrical hookup to the instrument trailer. A
site on Saweni Beach at the town of Lautoka has been leased; referto Figure A-24,
Appendix A,
for site location.
The five scientific personnel assigned to Subtask
A611 will live off the local economy and also operate Subtask A628.
VOL II
Spee 199
27-4
ad
wea.