OSE
MIDWAY
F&SNO.
24013
USER
TITLE
Aircraft Decontamination Pad
STRUCTURE FACILITY NO.
JTF-8
JTG 8.4
FUNDING
AGENCY
RDT&E
MILCON
SCIENTIFIC STATION NO.
None
($000)
BoD
None
ENGR
PROC
FoDGO+88%
CONST
TOTAL
POST-~-GO
Estimate 3/65
80.0
80.0
TOTAL
80.0
80.0
FURN
PRE-GO
ENGINEERING
To be initiated upon construction criteria submittal.
POST -GO
ENGINEERING
To be completed.
PROCUREMENT
To be completed.
CONSTRUCTION Navy Public Works Department will probably perform the
majority of work. A concrete pad approximately 70 x 300-ft. will be required
for decontamination of surveillance, diagnostic, sampler, sampler controller
and array control aircraft.
This is a monitoring, decontamination/washdown
installation for the aircraft. The location for the aircraft decontamination
pad has not been determined.
*FOD is required 30 days prior to "Minuteman" Nuclear Operational Systems
Test.
VOL II
24-12