war.
FRENCH FRIGATE SHOALS
F&S NO.
22004
USER
TITLE
Riometer Station -~ Subtask A628
STRUCTURE /FACILITY NO.
Tc
($000)
DASA/
PRE-GO
EAO 1106-|
POST-GO
RDT&E
4101-61
}
SCIENTIFIC STATION NO.
None
FUNDING
AGENCY
|
BODGO
93-3-4
ENGR
PROC
CONST
+105
FODGO+135
TOTAL
FURN
Engineering costs included in F&S Number 21007.
Estimate 12/65
|TOTAL
19.1
19.1
19.1
19.1
|
|
|
PRIOR YEARS
ENGINEERING Completed.
Drawings:
93-002-C2
93-3-4-Al, Cl and El
POST -GO
PROCUREMENT
To be accomplished.
CONSTRUCTION
Test Command will furnish the following equipment:
a) one
30 and 90 mc oblique antenna; b) one 30 mc Riometer antenna; c) one 90 mc
Riometer antenna; d) one instrument van; and,
e) one air conditioning unit.
The contractor will furnish one storage CONEX.
Power requirements are 10
kw, 120/240 volt, 60 cycle, 3 phase plus 100% backup.
This requirementwill
be served by utilizing the generators listed under Subtask A609 (F&S No. 22002).
The contractor will perform the following: a) provide a cleared, flat, unobstructec
area approximately 75 x 150-ft.; b) site the instrument van and the storage
CONEX in the vicinity of the Test Command erected antennas; and,
d) install
the generators and complete the electrical hookup to the instrument van. Refer
to Figure A-19, Appendix A, for location. Scientific personnel assigned to
Subtask A609 at this location will operate Suotask A628.
VOL II
April 1969
22-6
——