KIRTLAND AFB
F&SNO.
TITLE
USER
STRUCTURE FACILITY NO.
LRL
None
18011
SCIENTIFIC
LAPQ-1 Radar Workshop Building
SCIENTIFIC STATION NO.
BoD
None
FOD
FUNDING
AGENCY
AEC
($000)
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Prior Cost
TOTAL
7.2
7.2
7.2
*
7.2
COMPLETED
DESCRIPTION This prefabricated steel structure with a concrete floor slab was
completed in 1968. The 24 x 48-ft. building with an eave height of l2-ft. has an
8 x 10-ft. equipment door and a personnel door. A humidity controlled air
conditioning and heating system service the insulated building. Two (2) variable
speed electric trolleys of 1/2-ton capacity and 12-ft. hook lift heights are provided.
A 45 kva transformer northwest of the building provides 120/208 volt, 60 cycle,
3-phase power.
Interior and exterior lighting are provided,
DRAWINGS:
K-058-C8
K-058-S6
K-058-El4& El6
=Cost of construction included in F&S No.
K-058-M4 & M35
19007.