— CORB
KAUAI, AEC-TRE
F&SNO.
11010
USER
SCIENTIFIC
TITLE
Launchers
STRUCTURE. FACILITY NO.
Sandia
SCIENTIFIC STATION NO.
See Text
BOD
See Vol. Ill
FOOGO+120
FUNDING
AGENCY
AEC
($000)
ENGR
PRE-GO
Prior Cost
PROC
2.0
POST -GO
Estimate
CONST
TOTAL
102.0
104.0
FURN
TO BE DETERMINED
TOTAL
2.0
102.0
104. 0
PRIOR YEARS
ENGINEERING
Drawings:
Completed.
97.-3224B-C2 and C3
97-3224B-We
97-3225-S]
97-080-El
PROCUREMENT
JS 97-002-Cl and C2
JS 97-3224C-E7
JS 97-3224C-Cil thru C5
JS 97-3251A-E2 and E3
FO97-097-E}
F97-002-Cl
F97-027-E2andE4
F97-080-E4
F97-086-Cl thruC4
F 97-086-E]1
Completed.
CONSTRUCTION Fourteen (14) launch pads with ten (10) launchers are in place
at the AEC-TRF (completed in 1965).
HAD Launchers:
Nos.
8,
HAD Launch Pads Only:
9,
Nos.
10,
17,
11,
12,
13,
14 and 16.
18 and 20,
Universal Launchers: Nos. 15 and 19.
Universal Launch Pad Only: No. 23.
Universal launcher foundations can withstand a 500, 000 foot-pound overturning
moment and concentrated loads of 2-tons 60-inches apart. HAD launcher
roundations can withstand a 50, 000 foot-pound overturning moment and concentrated loads of |-ton 40 inches apart. Generators are the primary source
of power to the launchers with commercial power functioning as back up,
through an automatic transfer switch. Signal cable trom each launcher terminates at a signal cable shelter (Building 675) in the Secure Trailer Compound.
POST -GO
ENGINEERING
PROCUREMENT
To be accomplished.
To be accomplished.
11-7
were
VOL Il
Apeit tee