HICKAM AFB
F&S NO.
07060
USER
SCIENTIFIC AND SUPPORT
TITLE
Machine Shop
STRUCTURE FACILITY NO.
LRL
SCIENTIFIC STATION NO.
None
BOD
None
FOD GO+0
homey
AEC
($600)
ENGR
PROC
CONST
TOTAL
FURN
PRE-GO
Prior Cost
0.5
0.5
FY 71 (For Estimated Costs,
TOTAL
see F&S No. 07002A)
0.5
0.5
PRIOR YEARS
ENGINEERING
Outline specifications and preliminary drawing JS 95H-058-Al7
have been completed.
Fy 1971
ENGINEERING
PROCUREMENT
To be completed,
To be accomplished.
CONSTRUCTION A prefabricated metal building, 24 x 50 x 10-ft. high, will
house a machine shop within the expanded HAFB trailer park (see F&S No.
O7002A),
The building will have a concrete floor slab. Interior walls will be lined with
gypsum board and the ceiling will be acoustical tile. The building will be
insulated, air conditoned and dehumidified to maintain a temperature of 72 +
4°F and a relative humidity of 50 + 4%.
An8 x9 1/2-ft.
equipment door and
one personnel door will be provided. A tool crib, compressed air outlets,
and 120 and 208 volt power outlets will be provided in the interior. Fluorescent fixtures will illuminate work areas to a level of 100 foot candies. The
north end of the building will be floodlighted.
The completed building will be furnished with typical machine shop equipment
and spare parts.
This equipment will include the following:
Storage cabinets and bench tops
Adjustable workbench stools
Grinder
Contour band saw and filer
7~45
VOL II