HICKAM
F&SNO.
07024
USER
Ceiinenmennety
AEB
SCIENTIFIC AND SUPPOR
TITLE
Monitoring for Flightline and Maintenance Crews
STRUCTURE FACILITY NO.
SCIENTIFIC STATION NO.
None
None
TG 8.4
FUNDING
AGENCY
JTF-8
MILCON
($000)
ENGR
PRE -GO
Prior Cost
PROC
6.0
CONST
4.2
BOD
Foo GO+45
TOTAL
FURN
10.2
CRO 10-64
POST-GO
Estimate 12/65
TOTAL
6.0
4.2
60.5
60.5
3.4
60.5
70.7
3.4
PRIOR YEARS
ENGINEERING Completed.
Drawings:
JS 95-029-Al thru A3
PROCUREMENT
JS 95-029-Cl and C2
JS 95-029-E1 and E2
A sewage pump, lavatories and urinals, anda 112.5 kva
transtormer have been procured.
POST -GO
ENGINEERING
Completed.
PROCUREMENT
To be completed.
CONSTRUCTION This facility, which will be used for the monitoring and
decontamination of sampler aircraft personnel, will be located east of the east
end of taxiway 7 within a 128 x 142-ft. paved area surrounded bya chain link
tence.
The facility will consist of two (2) standard eight man tents, a wash car and
three (3) trailers.
The tents will be wood-framed,
ridge height of 12 1/2-ft.
lo x 32-ft. in plan witha
The tents will be lighted and provided with 110 volt
convenience outlets.
The skid-mounted wash car, to be located between the tents, will be 8 x 24 x
ob 1/2-ft. high; will be provided with showers, water closets, urinals, and
sinks. A sewage lift station will dispose of waste from the wash car. A
waterline will be provided in the pump pit of the sewage lift station so that
the effluent from the showers can be diluted prior to being discharged into
the base sewer system.
Three (3)
10 x 52-ft.
trailers will also be located within the compound.
7-27
ise
VOL Il
we