HICKAM AFB
07002A
(H)
SCIENTIFIC AND SUPPORT
Page 3
The ditch at the southeast corner df the trailer park will be realigned
or culverted.
(I)
The trailer docks will be recabled.
(J)
Additional 400 cycle power will be provided to meet added requirements. The following facilities require 400 cycle power:
USER
LOCATION
EG&G
Trir. No.
1
50
75
Trir. No.
3
50
75
Trlr. No.
8
25
50
Trir. No. 9
Trir. No. 12
Bldg. T-3208
25
5
5
50
25
25
Trir. No. 7
Trir. No. 9
20
20
20
20
3
4
LRL
SANDIA Trlr.
No.
AMPS, PRE-GO
F-2
Trlr. No. 9
10
Lo
No.
11
3
4
Trir. No.
12
3
4
3
4
Trir.
LASL
Trir.
No. B-13
Trir.
No.
8
Trlr. No. 9 (4-16-3)
Trlr.
No.
2
Bldg. No. T-3207
(K)
14
14
0
l4
0
14
14
14
A machine shop will be constructed for LRL (see Volume II, Plot
and Site Plans, HAFB, and F&S No. 07060).
VOL II
AMPS, POST-GO
7-10