(3) Delay in the entire long range UCRL large-
weapons development program would result since their
five test devices involved include extensive case
research tests. Since the results of these tests are
required before the full-scale devicescan be fired,
scheduling of events are more difficult, additional
delays may be anticipated.
At the same time greater
risks are assumed because failure of the mockupswould
lead either to extension of the cperation or delay of
test to the next operation.
i, Under Plan IIT the PILGRIM tests would be conducted at
NTS as presently planned but would require the redesign of some
test devices and suspension systems to accomplish a desired
sentencedLDLhanueceMAN SEVsergmieeeEERrene ants
reduction in the degree of difficulty (D-factor)}.
:
“Resahahet