A meter is included on the cover of the control box to indicate ground
level radiation intensity.

The amplifier bias, acale buck-out and

B plus voltmeter controls are mounted on a board within the control
box, and adjusted only during calibration.

Batteries are accessible

by releasing the snap locks on each end of the potentiometer board.
2.5

Calibration
The calibration procedure is divided into four phases:

1) The

preliminary power supply adjustments, 2) The "Top Hat" detector, 3) The
buck-out ciruit setting and 4) the altitude compensation circuit.
Calibration of this instrument requires a standard gamma radiation
source such as radium or cobalt 60 of suitable size, a vacuum tube

voltmeter and an ohmmeter.

The locations of the internal controls

are shown in Figure 10.
2.3.1

Preliminary Power Supply Adjustments
Connect the required cables between the "Top Hat", Control

Box and the Aircraft Radiation Recorder.
High Voltage Supply - If the vibrator does not start, ‘rotate the
vitran contact two turns counter-clockwise.

This control is reached

through the hole in the high voltage battery board (See Figure 10).
Set switch 8-1 to position SBT, turn the vitran contact clockwise until
the reed is heard to just start to vibrate and then advance the contact
1/8 turn.

When the switch is now turned from OFF to SET, the vitran

should start without further adjustment,

B plus Supply - With the switch at SET position, adjust R-29
to produce the minimum B plus voltage.

This point will be indicated

by the minimum recorder deflection that can be obtained with this control.

- 20 -

Select target paragraph3