OP=aRaATI]. HARDTACK Radiological Safety Suppozt for all Target Fleet Projects. In Operation HARDTACK the hulk of the rad-safe support will be committed to the Redex survey of the target fleet, recovery of experimental samples and equipment on the target fleet and the decontamination of the target fleet. This rad-safe support project would be a function of TG 7.3 that would support all parties involved with the target fleet, inclidingthe technical projects in TG 7.1. A group of health physicists and monitors would provide the rad-safe support and liaison between the TG 7.1 projects and the rad-safe support project. All logistic support to the TG 7.1 projects would be available through the APA Rar-Safe Center. The rad-safe support project would be an organization similar to Project 0.17 of Operation WIGWAM. &. SrECIAL REQUIREME TS AND CONDITIONS: The personnel necessary to staff Target Fleet Radiological Support Unit will be: a 3 health physicists from Naval Establishment to form the nucleus of the project. be 7 health prvsicists from AEC contractors. ‘@e 5 senior monitors from AEC contractors and L senior monitor from MRDL d. 14 BuShips civilian personnel to train as project monitors. e. 4 civilian electronic technicians (2 from AEC contractors f. 4 naval enlisted corpsmen for photodosimétry work. Be 1 yeoman he and 2 from Shop 67, SFNS personnel). 5 naval enlisted personnel to rm Change Station and for logistic support (supplied from APA). | The 39 personnel listed ‘in (a) through (g) make up a Red-Safe Group. Two Rad-Safe Groups will be organized, the second group to relieve the first weeks group midway in the operatin. Zach group will function for 12 (2 weeks travel, 4 weeks rad-safe training, 6 weeks at EPG), operating at the £PG during the period 5/19/58 through 8/7/58. Helicopter and P2V-5 aircraft support will be necessary for early time Radex survey of the target fleet and adjacent areas. The APA will serve as the rad-safe center for ship decontamination end base for operations for the Target Fleet Rad-Safe Project Office. Storage space ashore will also be required. 6

Select target paragraph3