The cost breakdown for the Terminal Instrumentation Complex is as
follows:

PRELIMINARY COST ESTIMATE

System

Instrumentation

Cost ($ Million)

Technical O&M

Manpower

Requirements

Technical O&M

Costs ($ Thousan

AN /TPQ-18

Lok

7

112

Telemetry & Acq Aid

1.4

2

80

Timing & Ops. Control

0.3

2

32

*

2

32

Computer

1.0

4

64,

Met Facility

tHe

salad

HK

Intra-site Comm

0.4

2

32

Instrumentation Vans

0.2

-

Site Prep & Utilities

1.3

2

Site Engr & Admin

=

a

Command Control

TOTAL

$9.0

27

TOTAL COST ESTIMATE (Preliminary)

($ Millions)
BLCUIPMENT

9.0

Technical O&M

O44

Logistic O&M

TOTAL

me

ca

0.4

$9.8

No cost is shown since one is available from ETR.

** This system should be operational prior to installation of the
Instrumentation Complex.

~20~

32

$436

Select target paragraph3