TO_GO (Months):

vork

11

1.5 months occupancy

9.5
no
bit

5.5

bau i

2.5

\U)

-

4, months construction time
3 months procurement and shipping
1.5 months design

amplifying: we now have about 11 months until shot time. The normal
time which experimenters ask for is a month and a half occupancy before the
shot.

The constyuction period on Ivy went fram July through October, about

s months, .Thig@neratian laoks Rigger by about a factor of 3 (in that
Ma
_
will each be about the equivalent of Mike

im comstruction and!facilities; the three barge shots are about like King),

put with high optimism let us call this 4 months again. Normal procurement
takes about 3 months (this may be more for difficult items), design about
1.5 months. So a motith fren today is the deadline for construction requirements on Eniwetok and Bilini.
FRG
It would appear thatithe only way the DOD requirements can be obtained

is to have a member of that or

on this full time. Campbell s
tive could spend a few days a
picture, what is available, the
experimenters.
ce

ORGANIZATION OF TU=-13

zation go around and collect then, working

sted it would be helpful if this representaAlamos familiarizing himself with the
tions, etc., then go see the various

7,

Colonel H. K. Gilbert has been a
ed as head of TU-13, with earrangements as described below for the next four nope? or so. The following
organization is proposed:

L.,

Com.

Uo

TU-13
Cc
Admin

l
Prograns

|

J
Reports

ry

||
—

pol

Requirements
——

Since Gilbert will be concerned mainly with Operation gshbt-Knothote

in Nevada for the next few months, Captain N. =. Kingsley

act

as his

Select target paragraph3