—
wat dheed.
Project 13.3 - Measurement ofTransit Time ~ D. Henry
J. Malik
Measurement of the transit time of the primary was attempted by
Sandia (D. Henry) using their R. F, telemetering system.
The device
a
was detonated outside of their field of view and no data were obtained.
-100 -