Water spray equipment: Packaged weather deck sprey units
togethey with installation plans heve been develeped by BuShips. These
units will be issued by the Supply Officer of the USS BAIHOKO (CVE~115)
tg ships of the task group in the ferward area,
The purpose of these units
4s te reduce the hazard of contanination from fall-out,
ce
oe
“.
,
~
(3)
Film badge desimeters will be furnished by
(&)
Decontaminatien clothing,
forward area,
-
.
CTG 7,1 in the
TDecantaminatien suits equivalent to
these described in detail in paragraph 36 (2) (a) of Appendix III of this
Annex shall be ebtained fer personnel of repair parties,
Waterpreef suits
when worn in tropical climated cause heat prostration too quickly te be
considered prectical for this operation,
ds
Grdup 7.3
Maintenance and Calibration bf Hndiec Equipment,
Units of Task
are responsible for the maintenence of their awn rediee equipment,
For repairs beyond the capacity of ship'sforce, a radiac instrument
repeir center and reserve insttunent pool will be maintained by CTG 7.3
staff personnel eboard the USS BAIKOXO, Radiec instruments needing
calibration will ordinerily be brought to the USs BslHOxXD for calibretiod.
Training exercises and callbratien drills, supervised by steff nenbers of
~
ee
CTG 7,3, will be conducted fer all ship's monitoring and decontanination
parties abverd the USS BalROKo,
8,
Pre-Shot Phase Specific Requirements
ea, BalROKO (CVE-115)
(1)
ae :
Assist TG 7,1 to establish the follewing:
(a) Phote: dosimetry laboratory.
7
(b) Radiological, center.
|<.
(c) eae Provide-space and pewer fer troiler laborators en-hangar
ery
:
:
*
aoe
.
.
‘
Liat
«
(a) Provide’ epace for rediac instrument repair shop.
’
6)
provide feoilities for and deve lep proficioncy in decontaninatinn
ef airoreft an board ship,
~
ey