SPCRET

18

One such tank had been cut apart to check on tie-in capability in fitting
a new nose on the tank.

To expedite matters it was requested that AFSWC

appoint a project officer to work with Tracerlab, Martin and the Kaiser
Metal Products Plant.

BEST AVAILABLE COPY

On 8 October at the Air Force Flight Test Center (AFFTC) at Edwards
Air Force Base, California, General Estes learned that no B-57 had ar-~
rived at that Center for testing.

The first B-57's had been scheduled

for arrival in late September or early October, but slippages had postponed their arrival until Noveaber..
Brigadier General Stanley J. Holtener, Commander of the Air Force

Flight Test Center, believed at that time that Edwards was to receive

eight B-57's between 15 November 1953 and 30 Janusry 1954. Extensive
testing was scheduled to get underway immediately upon arrival of the
first aircraft.

Altitude testing was not scheduled until late in the

testing series, but it was believed that ARDC would, if requested, accomplish that phase of testing earlier.

Approximately two years earlier, the B-57 Phase II Project Officer
had tested an aircraft of B~57 configuration, equipped with Avon engines

instead of J-65's, and hed found the aircraft extremely easy to maintain,
a quality which made it well-suited for sparsely equipped forward bases
like the Pacific Proving Ground.

Although not a part of Phase II test-

ing, the B-57 had been flown at 51,000 feet pressure altitwie with a
maneuver factor of 2.5G's.

Although the pilot had made no effort to ob-

tain altitude, he believed the aircraft could operate at 54,000 feet, if
equipped with Avon engines.

The Phase II Project Officer believed the

aircraft admirably suited for sampling missions.

AW sue

Although he had not

Select target paragraph3