.

tO:

.

ATIONS ORDE:‘No

‘DECONTAMINATION —
HEADQUARTERS.
| MASK GROUP 7,4, PROVISIONAL

eo
>

APO 187, ‘c/o Postmaster
San Frandisco, California --

7-April 1954, 1800M

o

1, MISSION: To provide, ‘operate and maintain facilities for person-

nel and aircraft decontamination and for personnel dosimetry,

PART 1

,

AIRCRAFT DECONTAVINATION

2.

PONSIBILITIES:
Ge

‘

Test-Support Unit:
(1)

pono
sate
200°

,

,

Aa

pe

Provide primary aircraft doqontamination facilities on

- ENIWETOKISLAND,

(2) : Furnish necessary supplies and equipment to decontaminate
all affected Air Force aircraft.

(3) - Be prepared to assist TG 7.3 in the decontamination of
Navy aircraft,

get. by Test Aircraft Unit:
(1) - Furnish representatives from communications to advise
the decontamination officer concerning’ any commnications
equipment . involved in the washdown of: affected aircraft.
(2)
Co

Furnish ground crew members. to assist in washing down

organisational aircraft,

:

Test Services Unit:

- (1). In the event of an accidential contamination, furnish
, representatives of communications and ground crews of
the ‘affected aircraft to assist in decontamination

operations,

3. . PROCEDURES: ‘Procedures’ to be followed are Listed below in in

chronological sequence of execution.

rehearsed, =

ae

=

ot

These procedures will be thoroughly .

.

a

On D-Day, sampler F-84's, B29 and:7.36 will be parked in

designated "hot" decay arease

.
be All other aircraft will be checked:pon landing for evidence
of radiological contamination, If an aircraft is contaminated, Above 25

ur/hr, it will be isolated and posted,
ec.

=...

‘

The ‘Sampler FB-36'3 will be parked;‘one! on the decontamination

pad and one on the turn around pad, and checked for radiation intensities by
the same monitor. uséd in ae and b. above. —

TASK GROUP-7.4

OPRS ORDER*NO, 525 -

ANNEXSN"

7. oe

- i

at,
ve

pe
vy

Select target paragraph3