salt water‘reduced theiy intcnsity from 12§ to 30 millé roentgens per hour (gamma only) be On b Maren 1956, decontamination work. on , . completed. Ths aethods used were similar to thoes aeuployed on the starboard side. ‘% the completion of the deve work the average desk intensity on the 7, While at anchor in BIXIME “TOLL the intensity reading on the salt water piping system did not exsecd 2 milli roentgen per hour (gama mly), on @ March 195%, the evaporator drain pump strainers were opened on al) four evaporators. The intensity reading of the scale accumlations was found to be 5 milli roentgen per hour (gamma only). 11 fresh water samples from the evaporators tested by Task Group 7.1 have show 1/5000 micro curries per milliliter or less. 8. Decontamination cf the ship was considered completed at the end of the day om 4 March 1954. Decontamination of helicopters and personne], conmtimues as required. DOET O' SEINE Copy tor CINCP..CFLT {ieee Enclosure (2)) COMIRP,.C (less Enclosure (2)) K~55=IV(2)