I presume you have talked to Rad-Safe about the safekeeping of the cobalt

A:

No sir, but I certainly will.

source?

.

Q: You seem to have a comparable job with Rad-Safe; have you discussed with them
the possibility of combining the developing of film units with the work done on
film badges at the Rad-Safe film badge development trailer?
A:

Yes sir;

I do intend to discuss this with them, as we have done this on

previous operations.

Project 2.4 = Decontamination and Protection - J, C. Maloney = CRL
The primary object of the project is to provide the data required for the

formulation of criteria for the decontamination, protection and recovery of

military bases. To accomplish this objective, it is proposed to determine the
relative contaminability of building materials by exposing panels of construction
surfaces = mounted on speciai frames at various pitches and orientations - to
high intensity fallout on the bow of the YAG ships. We will also evaluate the

effectiveness of decontamination methods and the practicability of such techniques

for industrial recovery, We want to evaluate the relative effectiveness of
protective measures; such as the painting of surfaces and the simplification of
structures or shapes, to cut down the contamination levels both before and after
decontamination, and to ascertain the effective scope and retentivity of the
contamination of surfaces. Operationally, we plan to take sets of panels of
different building materials and put these sets of panels on a frame.

The frames

will then be put on the bow of the liaison ships for exposure to fallout head
on, more or less. After the event the ships will be taken back to Parry Island
where H&N will take the frame off, and we will go thru with processing them

(ionic decontamination), There will be certain chemical and physical tests on

the surfaces = and an attempt to determine the depth of penetration of the
contaminant. We will participate in Cherokee, Zuni and Navajo, There will be
six men in the FA - four civilians and tw enlisted men.

Construction require=

ments on H&N will be small for the CASTLE facilities are to be rehabilitated.

Project 2.5 = Neutron Flux Measurements and Shielding Studies - Benjamin Barnett CRL
This project answers the requirements of DOD for neutron flux measurements
as a function of energy and distance. We are going to participate in all three

types of operation, I, II, III, (The three operations that you have on that
attached sheet.). These will include Cherokee, Osage, Blackfoot, Yuma and Kickapoo.
We will pyt out a number of detectors, gold, tantalum (perhaps ), iodine,
zirconium, and fission detectors. On Cherokee, we plan to have two stations on
Able, two stations on Baker, one on the edge of the Bravo crater, and one on the

Cop,ED/p

Lan;

Re Je

—Stehe————

°

inlining