PART til, CHAPTER 1
CHAPTER 1]
PLANNING
1.1
AFSWC; LASL; UCRL; Sandia Corporation;
and all other agencies that participate regularly
in EPG operations.
budget.
1.8
Plans for the improvement of EPG base
facilities (PAC construction) were drawn
up and submitted to ALOO by the Contractor
in March 1957 for inclusion in the FY 1958
1.2
Formal planning
for expendable test
The TG 7.5 Operation Plan 1-58 was
issued on 14 February 1958 and included
only essential classified information and in-
facilities for the HARDTACK Operation,
scheduled for Spring 1958 at EPG, began late
in 1956, several months after the successful con-
ctructions that could not be issued in the unclas-
tion of this series was 22 July 1956). Critena
1.9
Spring 1937.
OTO, ALO, made detailed advance plans for
their respective operations at EPG. The Financial Management Branch issued a classified
clusion of Operation REDWING (last detona-
for test facilities began to be developed in late
1.3
Plans for advance procurement and shipment of construction materials and equipment began at the Contractor’s Los Angeles
Office and at Jobsite in January, 1957.
1.4
Planning for all facets of TG 7.5 opera-
tional responsibilities for Operation
HARDTACK at EPG began in earnest in Jan-
uarv, 1957, with the preparation of the budget
for FY 1958. The scheduled PAC construction
assumed that Operation HARDTACK would be
approximately the same size as Operation REDWING.
1.5
As early as July, 1958, it became ap-
parent. hased on a study of TG 7.1’s general concept, that Operation HARDTACKwould
he at least 60 larger than Operation REDWING; hence, a revised estimate of required
funds was submitted to DMA. Authority for
which required this information.
The Chiefs, Financial Management, Se-
curity, and Communications Branches of
Chart of Accounts and detailed instructions on
the preparation of improved Cost Reports. De-
tails on Security and Communications plas are
covered in Chapters VII and VIII.
-
1.10
E-3, TG 7.5, was assigned the responsibility for TG 7.5 operational) plans, including evacuation plans. E-3 prepared, issued and
supervised the execution of detailed plans for
the evacuation of TG 7.5 personnel for each
event and coordinated the plans with JTF-Seven
and other Task Groups.
1.11.
Similarly, E-4, TG 7.5, was responsible
for the preparation and execution of plans
for TG 7.5 supply and transportation operations.
Plans for over-all requirements of supplies, ma-
procurement was also re-
terials, and equipment were prepared at Jobsite
and transmitted to the Los Angeles Office for
procurement and shipment to the EPG. Individ-
Coordination of all planning was effected
by AEC ALO direct communications with
requirements for Bikini Atol] and later for Johns-
additional advance
quested.
1.6
sified SOP. Distribution was limited to offices
ual plans were made for the over-all supply
ton Island. Changes and additions to the shot
the various Scienzitic Users; conferences spon-
schedule required an alteration of the supply
and transportation plans. Transportation plans
Base; engineering and construction conferences
by land, sea, and air were also continuous and
sored by CJTF-Seven; EPG Planning Board
meetings: Project Officers’ conference at Sandia
with H&N: and inspection trips to EPG.
1.7
In October. 1957, after receipt and study
of the JTF-Seven Operation Plan, the
Pacific Operations Division, ALO, began the
preparation of TG 7.5 directives. The Director,
for supplies, materials, equipment, and personnel
comprehensive. Brief reports on the transportation and supply operations of TG 7.5 are included in Chapters IX and X.
1.12
Another major field in which planning
played an important part was in the engineering, construction, operation, and maintenance of base facilities and scientific test
POD, made a decision to simplify the TG 7.5
Operation Plan through the use of a Standard
Operating Procedure. The bulk of routine instructions plus new instructions on items, such
as the check-cashirg service, that were not classi-
at Jobsite. The Chief, Los Angeles Branch, AEC.
to JTF-Seven; all Task Groups; all AEC offices
directly concernec: Ficld Command, AFSWP;
performed the same functions at Jobsite. For
fied were included in the SOP and distributed
BEST AVAILABLE COPY
facilities. Detailed plans and cost estimates were
prepared, both at the Los Angeles Office and
supervised the work and approved plans for construction at the Los Angeles Office. E-6, TG 7.5,
Page 39