FOOTNOTES FOR CHAPTER IV (Contd)
B.
ARRIVAL AND ASSEMBLY TIMES OF THE DEVICES
BRAVO
25 January -
Unit arrived at Eniwetok
17 February ~ Final assembly completed
18 February - Shipped to Bikini and trans-shipped to cab on 20 February
22 Feb
-_ Installation in cab completed
ROMED
4 March
5 March
7 March
9 March
11 March
25 January
2 March
8 April
9 April
es
-
&4
wr)
oO
14 April
- Unit arrived at Eniwetok
- Final assembly completed
- Unit installed on barge
é
- Barge departed for Bikin
-
angedg
boost.
y
rs
(used small one)
- Unit arrived at Eniwetok
- Assembly completed
- Reassembled after postponement and loaded on barge
- Barge departed for Bikini in LSD
cables checked out
- Final assembly completed after postponement and
loaded on barge
Barge towed to MIKE crater at north end of Eiwetok
lagoon, anchored, and cables checked out
acket removed and dummy
AR WUC
.
1
25 January
Jigs attached to the case
q)