a.
Project Manager.
COMPMTC was designate@
Project
Manager for the subject survey in CNO msg 01l0007Z APR 78
and will continue in this capacity through projéct completion,
coordinating and providing, on behalf of DON, a]jl logistics
support required by DOE for the accomplishment
£f survey
objectives.
b.
Aerial Photographic Task Element.
The
@fficer in
Charge of the EC-121 aircraft detachment will ré@port for
operational control directly to the Project Mandger for the
conduct of Phase I of the survey, and will function as the
primary point of contact for the DOE Technical
epresentative
having technical direction responsibilities for[the conduct
of Phase I of the survey.
c.
Aerial Radiological Task Element.
This|Task Element
will accomplish Phase II of the survey utilizing
USNS WEEELINS
(TAGM-8), assigned helicopters and associated s€pport perscennel
and equipment.
(1)
Logistics Support Task Commander.
Embarked in
USNS WHEELING (TAGM-8) will be a Logistics Suppg@rt Task Cen-
mander (LSTC) who will function as the primary
point of contact
for the DOE representative exercising technical]direction reszrn
Sibility for the conduct of Phase IIT of the surfey.
The uST?
will have overall operational control and managg@ment reszen-
sibility for DON provided logistics support.
DE represencatz.:
will channel survey logistic's support requiremg@nts throwch ine
LSTC who will then-coordinate the mutual efforts of the