|
én
sda _stasoeen
acustininagane
~~
a
Navy Project Manager for coordination and execut ibn of DOD
responsibilities for rendering logistics support
o this
survey is Commander, Pacific Missile Test Center
Pt. Mugu,
California.
a.
PHASE I.
Initially, a photographic surv y of eleven
(11) atolls and two
(2)
islands in the Northern
arshall
+
This platform has been specially configured to r Eceive DOEprovided high resolution and infra-red capable c Ameras, plus
*
a eit nate destin
”~
.
Islands will be accomplished utilizing a DON EC- L2l1 aircraft.
additional peripheral support equipment.
(1)
Phase I will be accomplished under the operational
direction of the Project Manager (COMPMTC), in 4d ecordance with
the technical direction and advice of the on-si/j le DOE representative and the terms of this MOA.
(2)
COMPMTC will promulgate an approprfate Operations
Order for the accomplishment of the Phase I misBion.
b.
PHASE II.
Utilizing data gathered fro
photographic survey, an
(11)
atolls and two
(2)
the foregoing
Aerial Radiological Survey of eleven
islands will be conducitfed by means of
SH-3G helicopters equipped with DOE-provided rddiation detection
and recording instrumentation.
operate from USNS WHEELING
The helicopter
will normally
(TAGM-8), a base support ship which
will, in addition, provide a wide range of logkstics support.
Flying relatively precise tracks at specified Altitudes and
air speeds, the data collected will be reducedJ
and result in