ARTICLE III
Methodology
This work will be accomplished by an analyses of avai
background data, a series of on-site surveys, discuss
current health care providers, and evaluation of heal
needs as outlined in the Loma Linda University propos
pages 4 to 12 and addendum of September 17, 1980, on
ARTICLE IV
A.
Deliverables
Letter Progress Reports
The contractor shall prepare and submit two letter prdgress
reports not to exceed five pages in length.
Each of
shall:
l.
Identify project status, including an e
percentage completion.
2.
Report expenditures in period of report and cumulatively
and explain deviations from estimated expenditure lev ls; and
3.
Summarize work performed; accomplishmen S; and
problems encountered during period of report; plans f r succeeding
period; and actions requested for the Department of t e Interior.
B.
Draft Report
The contractor shall submit a draft report in six (6) copies as
indicated in A above.
This report should include the results of
all the research and any findings. Submission of thi
report should mark the completion of the major elemen
contract, except incorporation of the Department's co
preparation of the final report.
The report will he
to DOI for discussion on November 19, 1980.
Delivery:
Cc.
Six (6) weeks after contract award.
Final Report
After receipt of the department's comment on the draff— report, the
contractor shall prepare and submit the final report fo the
Department in six copies as indicated in A above on DPcember 3, 1980.
ARTICLE V
Period of Performance
The contractual period of performance shall begin on Pctober 3
ll be
1980; and all work and services required hereunder s
completed on or before December 3, 1980.