j

@

oa

SEERET ©

Establish the capability at Taongi to becumulate weather information

and data, This station should start es soon as possible and continue
until just prior to the Hardtack Operational phase, This viewpoint

has already been expressed in a letter dated 21 January 1957, Dr.
G. W. Johnson to Captain K. Musick,

3.

Immediately determine if ean airstrip is justified since this would

constitute the major effort ashore and fixes the scale of effort required from the contractor at Taongl.
Fix the method and responsibility for the opening of the channel as
soon as possible after the completion of the preliminary inspection
and oceanographic survey trip.
Accomplish the task of choosing and obtaining the diagnostics ship

just as early as possible in order to begin the time consuming
experimental outfitting and reconfiguration soon.

Select target paragraph3