6

Cost Estinetes. The items of vork
in the folloving tables:

e

emplated and the cost estimates are sunmmerized

Minimm Requirements

ITEM
le

2.
3.

h,

5.

ESTIMATED COST

Beachhead ~~

Concrete Station (As Station 70 - Redwing) ~~

300° Steel Tower (As Station 5- Redwing), __

6.

Pive (5) Barge Anchorages

9.

Seadromes

To
8.

12,000.

Camp (aa Fox-Redwing) <
Access Channel - 20' Deep <

Tater-Atoll Commuatestionsx
Sulmarine Cable »

325,000 =
686,000 —

00
—

5

/"222,000_

' 243,00067

96,000" |
:

2,422,000

TOLAL MINIMAL CONSTRUCTION

»

Ns

RECAPITULATION

471, 340%

Construction Equinaent

35,000 -—~

Operational Equinnent

2,422,000 -: Gre

Construction Projects
TOTAL
Maximum Recuiramonts
ITEM
i.
2c
3.
4,

Beachhead
Camp - 200-Man
Airstrip
Aecess Channel - 20"

6.

Five (5) Barge Anchovages

5.

7.

8.
9.

10.

1.

12.

13.

3 Concrete Stations as Redwing

Seadrome Facility

Iater-Atoll Comnunications

Submarine Cable

300' Steel Tover

Comerete Station (Redwing - Station 70)

Access Roads and Cansevays

Mole TypePier .

TOTAL CONSTRUCTION
RECAPITULATION
Construction Equipsen’

Opersticnel Equipmesnt
Construction Projects
€fhis is the end of the quotation from

the Task Group 7.5 report. }

2,928, 340