6
Cost Estinetes. The items of vork
in the folloving tables:
e
emplated and the cost estimates are sunmmerized
Minimm Requirements
ITEM
le
2.
3.
h,
5.
ESTIMATED COST
Beachhead ~~
Concrete Station (As Station 70 - Redwing) ~~
300° Steel Tower (As Station 5- Redwing), __
6.
Pive (5) Barge Anchorages
9.
Seadromes
To
8.
12,000.
Camp (aa Fox-Redwing) <
Access Channel - 20' Deep <
Tater-Atoll Commuatestionsx
Sulmarine Cable »
325,000 =
686,000 —
00
—
5
/"222,000_
' 243,00067
96,000" |
:
2,422,000
TOLAL MINIMAL CONSTRUCTION
»
Ns
RECAPITULATION
471, 340%
Construction Equinaent
35,000 -—~
Operational Equinnent
2,422,000 -: Gre
Construction Projects
TOTAL
Maximum Recuiramonts
ITEM
i.
2c
3.
4,
Beachhead
Camp - 200-Man
Airstrip
Aecess Channel - 20"
6.
Five (5) Barge Anchovages
5.
7.
8.
9.
10.
1.
12.
13.
3 Concrete Stations as Redwing
Seadrome Facility
Iater-Atoll Comnunications
Submarine Cable
300' Steel Tover
Comerete Station (Redwing - Station 70)
Access Roads and Cansevays
Mole TypePier .
TOTAL CONSTRUCTION
RECAPITULATION
Construction Equipsen’
Opersticnel Equipmesnt
Construction Projects
€fhis is the end of the quotation from
the Task Group 7.5 report. }
2,928, 340