oo oleaMimcslna| 408010 HOLMES & NARVER, INC. ENGINEERS—CONSTRUCTORS 828 SOUTH FIGUEROA LOS ANGELES ‘ . REPOSITORY Nevada Opera Tens OG Le STREET LOS ANGELES WASHINGTON, D.C. HONOLULU, T. H. 17 U.S. ATOMIC ENERGY COMMISSION Contract No. AT— (29-2) —20 cottection // & 56 BoxNo, ZAAYF er FOLDER his report copy iS only leose in Box. ex cer pt. nie sti a Thais 15° Mr. Joe B. Sanders, Director July 2, 1958 Pacific Operations Division U. S. Atoric Energy Commission Post Office Box 5400 Altuquerque, New Mexico Subject: LONG-RANGE FLAN FOR BASE FACILITIES, ENIWETOK PROVING GROUND 1 Dear Mr. Senders: ‘ Transmitted with this letter are nine (9) copies each of the "Long-Range Improvement Plan, FY 1959 through FY 1962" in two volumes. AEC letter ET: PWS-2179, dated February 20, 1956, requested that Holmes & Narver, Inc., prepare a long-range plan for base facilities at the Eniwetok Proving Ground. The plan was requested to be presented in two phases covering a pericd of six years from the date of the letter. The first phase, covering FY 1957 to FY 1958, was published June 1, 1956. The second phase is presented in the two volumes of this present transmittal. All recommendations of the 1956 presentation which have not yet been constructed have teen re-evaluated and are incorporated in this second phase report. Very truly yours, HOLMES & NARVER, INC. S. P. Howell, Manager AEC Facilities Project SPH: SEW mm Enclosures Mr. F. W. Hohner, AEC/LA, w/1 encl. Chief, Constr. & Planning, w/l encl. Mr. E. W. Wynkoop. AEC/EBO, w/5 encls. H&N Resident Manager, =PG, w/l encl. Mr. Rk. W. Newman. J6, LASL, w/2 encls. Heil Resident Zngineer,=PG, w/1 encl. Mr. F. B. Petrie, L6, UCRL, w/2 encls. Contract Administrator-9h2, w/o encl. vlee Freciient, Tenstr. Jiv./ Protect Ingineering File, 4 w/lO encls. i4 ce: (9) Sets Je fa vant Ae aE Taam — om MA Ae Doe te Ts 4 Lie fr Wel ys -7/f} wv _ armal i cae ©

Select target paragraph3