Chief of Operations

soy
Ot

eg OK e CARER:

‘2¢
BEAT

BUNKERS

-

Og has

I am enclosing 4 copy of 4 report, date: Novemper 9, 1953, on tests
made by the Engi ceriiy Nvisier under sim iiate conditions for cour
information.
As soon as the first door is in operative condition we should make
sufficient closures to determine if t:¢ two sets of sill blocks for

each: station are sufficient.
This determira.ion ean be made at the
time the doors are tested for speed o” closing.

The molds for these sil blocks ar 2° «1 « faded Shipyards Corp., plant
and additional biocks © o ld be omiers. fre toen if required,
yw

14

ao
°
°
— . FF. lowell
‘ef of OQvnerations

SPHinr
Enel, (1) Memo frm Duve varver, dr.,

dtd 11/9/55, sung. Bakes) FLO,

2960:

ave Narver, Jray W/O enc,
é/S Resident viner.
G.. of Procereren:
Ch. of Operaticns

Central] Fi’ es

oe

30 Rovenber 1953

some concern exists in my mind as to tie amount of compression that
the subject lead sili vlecks will rece've 1 er the shutter is closed,

ee

FROM.

_ Project Manager