UNITED STATES
ATOMIC ENERGY COMMISSION
WASHINGTON, D.C. 20545

January 21, 1969

UNCLASSIFIED
CONFIRMED 0 BE
Lt. Col. Anthony A. Gomes

Division of Military Application

ft,

aE

RITY: DOE/SA-20

dB. Re GILCo

COMMENTS ON MEMORANDUM OF UNDERSTANDING BETWEEN AEC AND DOD ON A
BIKINI CLEANUP
There are several areas of concern that we have for this sgreement

nud that hive been Qiseussed by OF stult.
1.

‘

We have concluded that the responsibility for rudiolosie.l snifety,
of the rehabilitation of Bikini Atoll for which the Department of

Interior is looking to the AEC, is a continuing responsibiiity
that will persist long after the JTF-8 scrap removal operation is
completed. The initial scrap removable project is only a portion
of this responsibility. Sinee we in AEC will have to live with
this problem and anything unexpected that occurs in the years

ahead, the responsibility for determining when health and safety
requirements are met should not be delegated to the Project Manager.
2.

Our usual procedure for assuring safe operations and determining
thut prorram objectives are to be met is to require
review ol’
pians prior to operations, to closely follow the implement ution

of plans during operations, and to review and evaluate objectives
and results obtained at the close of operations.

A requirement

for these functions to be performed by AFC should be written into
the Memorandum.
3.

Assurance of radiological health and satety is eenerally nehieverd

through a system of checks and balances, i. c. certrin preeiubions
are taken to avoid or minimize exposure, then followup surveys

and studies are made to insuré the adequacy of these measures.
This is particularly appropriate for the Bikini resettlement
wherein AEC has made recommendations affecting the agricultural
recovery of the Atoll and covering a level of followup requirin;
n continual cheek of the radiation status of the peopic. This
is sunother reason not to delegate responsibility for comp} innee

with salty requirements to the Project Manager.

.

O8 expect: to closely follow thic work us il in cexzpeebed Let

PeM and the Ad Hoe Committee and even FRC staff muy wint to bec

kept informed as it progresses.

In this regard, and while we

can understand the need to get started in the near future, wo ari

concerned that there appears to be no provision for AKC to Jol. low

this effort such that we may keep ourselves and others informed.

3ja¢-72.3%