a mA Results Results of the exposed germanium are not available (samples sent to ZI for analysis). The fission detectors that were recovered were countable in spite of the high background resulting from the late fall-out on Parry Island. —————__" the counting1WASbegun |on1 D+6, For ee EESSoretcc naamgtltte Cl NIPOae However, calibration of the samples extends’‘only 25 hours and- the figures given are estimates resulting from an extrapolation. Long-time calibration will be made for this . project in the composite preliminary report for Castle to be submitted later. , oeeee Stability of the 1403 concrete stations The unrecovered stations had disappeared. SOP1ED/DOE Lan87 . eae7

Select target paragraph3