Chapter 3—Containing Underground Nuclear Explosions @ 45

Figure 3-8—Tunnel Closure Sequence

A ier
‘

———-

ime

Working dont

Mauttier

|

LES 9106
2ca closure TAPS,

Ground

|

snock

Mechanica ¢osure MAC

Stemming
olug
8

eS

|

|
|

Tesi cnamoer

.

g

E1c of slemmin

Mecnanical ciosureiGSAC)

yy

Qa
»

003
seconds

pommel presen eyo
a
»
Mecnarica closure: TAPS)

Working aoin* Bg

=
|

Mecran ca! closuretGSACi

7

=

LA

Test chamber

Ena of stemming

Mecnarical ccsurei MAC)
Ground \
spock .

Stemming ofug

\

C005

seconds
\

f

Warkin

/

Residual stress
hed

e

Test chamber

End of stemming

/
Mecnanical ciasure( MAC,
Ze

(Peak -0 3 kbar)

\\

>

\

Goa:
snore

Stemming
dlug

Final cavity
02

a

Mecnanical c‘osuret TAPS)

Mecranica: closuretGSAC |

Point, °

BD

=

3

(<0. kbar)

1

|

Working point

Mechanical closures TAPS}

Mechanical closureiGSACy

‘

\

des

=

seconds

|

|

Test chamoer

:

Eng of sterming

»

Mecnanical c osurerMAC)

Residual stress
field
(Peak “0 3 kbar)

.

Final cavity

—€

975

0 1 koar)

!

Stemming

olug

seconds

~
|
Working point

}

7

|

Mecnamecal closureiTAPS:

Mecranica ciosurerGSAC)

Ead

nd

Test chamoer

of

y

by

of stemmin

siemming

Mechanica: ciosureiMAC:

A) Zero Time: Explosion is detonated and the first two mechanical closures arefired. B) Within 0.03 seconds, a stemming piugis being
formed and mechanical pipe closure has occurred. C) Within 0.05 seconds, the stemming plug has formed. D) Within 0.2 seconds,cavity
growth is complete and a surrounding compressive residual stressfield has formed. E) Within 0.75 seconds, closure is complete.
SOURCE. Modified from Defense Nuclear Agency.