quae
3.7.3

3-32

In accordance with CJTF SEVEN Operation Plan,

Intra-Atoll Airlift.

CTO 7.3 and CTC 7.4 provided aircraft for inter-island airlift of personnel
and cargo as follows!

CTO 7h

mo .

ENIWETOK ATOLL

Hel9

{

CIG 7.3 (HR 361)

:«_°. ~:.. BIKINI ATOLL

6

H-21

9

L-20 Liaison

6

15
s

{ete th)

Initially, Je3 was to control personnel movements and J-l to control

cargo, but it soon developed th2t J-3 was atle to control both since the
priority cargo was ordinarily associated with an urcent operation which re.
quired concurrent movement of personnel,
The followin: summary of suport aircraft performance records gives
a realistic picture of the scale of inter-island airlift oper ‘tions during
the construction, operational and roll-up per‘ods:

Suport Aircraft Performance Records
EXIWETOK
Jan

Feb

Mar

478

;
sis.

Avr

May

Jun

Jul

H-19 & He2]
Helicopters

Flying Hours

398°"

Passenzers

2833

186)

Cargo (lbs)

11968

19750

% in Commission

osu.

392-707
735 900

«569399
685 «75

$668: 6746 5583 3686

$éab0°" set00 7600 53350 26100
68

73

70

77eL

=70.2
ewe,

L-20 Aircraft

Hissions

2u5

Sg

772

85h

ho

837

ki9

Flying Hours

175

260

435

30h

dS

295

143

1409

1832

2513

1661

2851

2089

625

2763

3490

6993 10736 10561

8757

5835

“Pp,
4

Passengers

4o““eargo (Ibs)
Abin

f

iissions

“Eye

ne

ee

Select target paragraph3