that the subject should be reserved for the interagency
meeting.
The AEC is seeking to fund the October-December
radiological field survey and evaluation of samples at a cost
of approximately $500,000 while DNA plans to fund certain
logistics support to this radiological survey as well as
the preliminary engineering survey at a cost of about $150,000.
e.

General Plan.

(1)
The more detailed radiological survey of the
atoll islands is scheduled to begin sometime in late September

or October when the AEC research ship,

station.

PALUMBO, arrives on

AEC will initiate this survey and DNA will furnish

transportation and make other base support available from the

PACE augmentation to normal Eniwetok assets.

(2)
The more detailed engineering survey should be
made concurrently in order to support the radiological survey
as well as take advantage of the information on radioactive

debris as it is gathered.
The PACE activities are scheduled
to be phased down during the period 26 September - 5 December
1972, awaiting comments on the final environmental impact statement.
Thus there should be little competition between PACE
and this combined survey for boats and other logistics support.
DNA plans to make $150,000 available for supporting this survey
and plans to seek the assistance of the Pacific Ocean Division .
(POD), U.S. Army Corps of Engineers for performing its engineering phase.
There is an Area Office of the POD located at Kwajalein,

mera

389 miles from Eniwetok.

o
(3)
Only after a more detailed survey such as this ad
can it be determined whether some of the islands can be made
safe and whether the lagoon marine life is sufficiently free of
contamination to support the returning Eniwetokese.
Also, at
this time, it is not certain that the cleanup of Runit Island

is economically feasible.
If not, it may be necessary for safety
reasons to retain it under a use agreement with the TTPI in order
to control entry into this hazardous areas.
(4)
Upon determination that return of the native
population is feasible, the actual cleanup can begin.
There

should be sufficient data analyzed by January or February 1973

to determine the pattern of contamination.
Conceptually, it
is agreed that cleanup should begin on the least contaminated
islands in the South and continue counter clockwise around the
atoll chain, returning to those islands being used for PACE