At a September meeting at Los Alamos the future requirements for Li-6 had been raised, and a new plant would be constructed to meet the increased needs, The Colex process had been chosen as the one most likely to meet. scheduler. | GLETED Irn schedule for the new plant is: first operational phase, April 1955; final, October 1955, The new plant will cost about $70 million, including $13 million for mercury; the Elex | cost was $45 million, to’ about $3/gran. The operating cost of the new plant will amount The new plant will probably not meet future requireey ments completely; additional capacity of : depending on the isotopic concentration. after the Castle tests. =) may be necessary, This question will be considere Orex may be of some promise for the third ADP plant, but Colex looks better at present. A new boron-10 plant is being built at the Lake Ontario Storage Boron-10 works. It will cost $1.5 million and produce 250 kg B-l0/year. Operatic is expected in the first part of 1955. Current thinking about power levels at the reactor sites is Reactor Power Levels optimistic. The optimistic expectations are now for 8000 MW at Savannah River and 12,500 MW at Hanford. These are not yet assured, The Savannah River figure assumes success with the flat plate fuel elexent development. od pagHeTEE Encouraging results ‘have been obtained peretaleCf Froee-trace ete ' The oye f~t . ~ ee Fao bee ly awl x J 7° te v6

Select target paragraph3