TABLE 3 - Cont'd.
Thailand, Bangkok
Collection
Period
1957
me Sr?°/pi=
Cumlative,
me Sr79/ni
250
Sr?
*
Precipitation
(inches)}
March,
to
—
0.38
2
0.04
ome
—-=
November
December
1958
January
February
Sample not collected
0.12 # 0.01
0050 2 0.04
8
Sample lost in transit
1656
1.56
March
0.04 * 0.00
0.54 2 0.0)
5
April
0.04 2 0.03
0058 2 0.05
hh
0.12 -
5/1 to 6/4
0.05 ® 0.03
0063 2 0.06
17
1.56
6/4 to 7/3
0.17 2% 0601
0-80 2 0.06
719
7/3 to 8/1
Oe0 20.02
1420 # 0.06
86
August
September
October
November
* Values extrapolated to midpoint of collection period.
- 38 -
0.12