item
‘umber
Purpose
Situation
IoImr
WI
Vehicles
Truck, 1/L Ton
148123
99
TG 7.1 4otor Pools
Truck, 3/h Ton
Wh %
69
70 7.1 doter Pools
Truck, 23 Ton
2, 20
12
TG 7,1 Motor Pools
BB
DB
1G 7.1 ‘oter Pools
Truck, % ton Pickup
.
Truck, Decon
y,
&
&
2
20 7.1 voter Pools
Truck, Tractor
i
3
3
2
fC 7.2 ioter Pools
HOTES :
1.
The adcwe ostimated requiraents make no provision for udditional
ships to permit an afloat operation at BIKINI since it is contemplated that
personnel will be able to remain on ENYU for a1 shots.
In the evert personnel
and aircraft must be evacuated, firing will cease at SIKINI unless the chips at
TAONGI are utilized to mairtain operations afloat,
If so, Mrings wuld then
cease at TAONGI,
2.
the requirerents are based on the assumptions included in this study.
For a specific operation, they would have to be restudied and adjustments made
accordingly.
3.
The above do not include the ships, craft or aircraft required b. any
AFSYWP effects projects.
»
At TAONGT it is felt that there should be two large ships, one of
which is capable of handling and providing at least minimm naintensnce
le
esi
gc
~~}
C4
facilities for helicopters,
a
ar
*