item ‘umber Purpose Situation IoImr WI Vehicles Truck, 1/L Ton 148123 99 TG 7.1 4otor Pools Truck, 3/h Ton Wh % 69 70 7.1 doter Pools Truck, 23 Ton 2, 20 12 TG 7,1 Motor Pools BB DB 1G 7.1 ‘oter Pools Truck, % ton Pickup . Truck, Decon y, & & 2 20 7.1 voter Pools Truck, Tractor i 3 3 2 fC 7.2 ioter Pools HOTES : 1. The adcwe ostimated requiraents make no provision for udditional ships to permit an afloat operation at BIKINI since it is contemplated that personnel will be able to remain on ENYU for a1 shots. In the evert personnel and aircraft must be evacuated, firing will cease at SIKINI unless the chips at TAONGI are utilized to mairtain operations afloat, If so, Mrings wuld then cease at TAONGI, 2. the requirerents are based on the assumptions included in this study. For a specific operation, they would have to be restudied and adjustments made accordingly. 3. The above do not include the ships, craft or aircraft required b. any AFSYWP effects projects. » At TAONGT it is felt that there should be two large ships, one of which is capable of handling and providing at least minimm naintensnce le esi gc ~~} C4 facilities for helicopters, a ar *

Select target paragraph3