¢. : a on the job, dosages equipment operators received, effectiveness of the decontamination, time required to camplete the decontamination, photographs, and any other pertinent facts relating to the problem. Upon completion of this report, a copy will be submitted by the Assistant Manager, Office of Test Operations to the Division of Biology and Medicine, IMA, Washington, D.C. Work performed on all decontamination projects will be coordinated with CT¢ 7.1, cru-6. 7. NON-TEST PERIOD OPERATIONAL GUIDE a. Radiation Exnosure The cumulative exposure to TG 7.5 personnel during non-test periods will be the same as currently authorized for the operational period. Every effort should be made to keep person-~ nel exposure to a minimum. b. Radiation Contamination ‘The 2ontamination limits as prescribed in paragraph 5b also apply during non-test periods. c. Entry into Contaminated Areas (1) ° Entry of all personnel into contaminated areas will be controlled by the HRN Rad-Safety Organization. ~l1h- Gate, COPIED/DOE LANL RC en ee eg - = 7 Tpapen Ie