fen & _ G7 h. Removal of Radioactive Material During test periods no radioactive material, except material shipped by fly-a-way aircraft, will be removed from EPG without prior written approval of CTU-6. All other radioactive materials which are removed from EPG will be packaged, monitored, labeled, and loaded so as to satisfy the Interstate Commerce Commission and MATS regulations for transporting radioactive material. 1. Emergency Plan An emergency plan will be prepared by the Support Contractor Rad-Safety Officer that will set forth in detail those procedures dealing with situations that require TG 7.5 personnel to remain indoors and those which require people to be evacuated. Emergency programs will be coordinated with CTG 7.1, TU-6. 6. DOCUMENTING DECONTAMINATION The Support Contractor will, at any time that it becomes necessary to decontaminate an island or area that has become contaminated as & result of radioactive fallout, submit a full report in quadruplicate to the CTG 7.5. This report will include such data as: map of area showing radiation intensities, radiation levels at specific locations prior to decontamination, radiation levels upon completion, effect of character of terrain on radiation intensities, type of equipment used ~13- COPIED/DOE LANL RC 16