e

_~

Cc

».

7

C

Concept of Orerations
CJTF SEVEN No, 3-53
DURING BIKINI OPERATIONS

TG 7.2
(Cont'd)

‘95 = PARRY ISLAND
30 ~ Other islands of
:
ENTWETOK

T 7.3 ° .

4230 30 +
165 =
303" ~

1 7.4 °"

Jf,

-

.

Te

|

aot

dicihed, Loe.don oe ow

95 — PARRY ISLAND
30 ~ Other islands of
ENIWETOK

Afloat |
‘
PARRY ISLAND
ENIWETOK ISLAND
KWAJALEIN

4200
60
165
303

8 = AGC (5 Cabin Class)

=
~
=
-

8 - ace (5 Cabin Class)

84 - Weather Islands =

36 - BIKINI ATOLL 64 - KWAJALEIN

—s 8: = ~-Weather Islands

vy

oo
64, - KWAJALEIN

AGC (15 Cabin class)
AV ( Cabin Class)
AP ( Cabin Class)
ENINMAN ISLAND .

aa f

«.

438 - Other islands of BIKINI
oo

.

-.

,

95 = PARRY ISLAND.
1150 = PARRY ISLAND:
si‘.
40 - ENIWETOK ISLAND
40 — ENIWETOK ISLAND: -

-,. 143 - Other islands of =...

90

Afloat
PARRY ISLAND
ENIWETOK ISLAND |
KWAJALEIN

28 = CVE (7 Cabin Class) 1579 ~ ENIWETOK ISLAND
1é19 - ‘ENIWETOK ISLAND

30 270 ~
491 —

oles

T 7.5

DURING ENIWETOK OPERATIONS

_

..- Other islands of °

JENIWETOK ©2250) 0S

= .-

ENTWETOK © 0

‘Coordinated’‘Inter-Istand Airlift Operations.. The limited available>
at
lity of aircraft to support inter-islandairlift operations will”:
necessitate maximum utilization of all inter-island equipment in the:
forward area.. To assure maximum utilization and provide efficient-

service in support of the overall task force mission, aircraft will-

be centrallycontrolled and dispatched by the commander responsible’ Me

~(CTG 7.3.at BIKINI and: C1G 7,4at ENIWETOK) forproviding the’ serv-

+."

ice. Using ‘agencies will’ berequired to plan their movemert,vaethedes

ties well, in advance to-permit proper ‘scheduling, a

.

es

, Coordinated “Inter-Atoll “Adrift Operations.one7 4 will povide a
an inter-atoll airlift system between ENIWETOK and BIKINI ATOLLS oor
with flights to other atolls in the forward area as required to’.
.
support joint task force elements. Using agencies will be required
to submit requirements well in advance to permit proper scheduling.

Subsequent to the last shot at BIKINI, the ENIWETOK-BIKINI service

will be provided by PEM aircraft, taking off from ENIWETOK Ronete

airstrip and_ landing inthe BIKINI lagoon.

Except—for-MAjURO,

he weather island airlift will be con-

4

trolled byz gr 7} imcosndination
with
CIC-3-b vTILizine PEM Ai@cREF 7Mac
VAWRELE

TRE CC, Navan STATION Ku ayALein,

Coordinated seat Pool Operations,

Since both CTG 7.3 and CTG 7.5

will provide large scale boat pool service at BIKINI ATOLL for rul-

tiple using agencies, overall control of this activity by either
task group commander will not be feasible. A Joint task force
scheduling | panel consisting of renrecantatien- -2 ™ 7 4 24TH OTLE
.
Tet gel epee eee ov Sshuwd ALULL under the direct

supervision‘of CJTF SEVEN.

Prior to the last shot at BIKINI, the

TG 7.5 beat pool will be evacuated to ENIWETOK at which time *cTG 7.3
will assume respensibility for all boat pool operations at BIKINI.
CTG 7.2 and CTG 7.5 will continue to operate their respective boat
A~L

RERT AVA ARILE COPY

Select target paragraph3