““e

i

fC

Rediolori ee a

d

_

CJTF SEVEN No. 3-53
b.

to.

ke

e

@

|

Provide completv allowances of RADIAC equipment end special clothing,

The requirements of CTG 7.5 will be included in the allowances of CTG 7.1

for necessary issue to TG 7.5 personnel during the operational phase and
for subsequent loan or sale-to CTG 7.5 for post-operational use at the

Pacific Proving Ground,
,

ce.

Prior to the first shot minus 10 days,. forward to CTG 7.1 (for use of
radiation

the RADSAFE CENTER in conjunction with fim badge/dosage control) a List.
to whom film badges will be issued during

ing of TG personne}:paRbLapatiye
Ser the overseas phase of the operation,
Within five days following each shot, provide CTG 7,1 with additions ot
MelSEIGHX to previous lists,

Lists will indicate full name, rank or ,

rate, serial or service number if applicable, and home stetion or
laboratory as appropriate,.

The Commander, TG 7,1, having the major technical radiological safety
unit, wills
a. Perform all ground monitoring services associated with scientific
missions except those in conjunction with aircraft and airborne collec=
tion of scientific data,

se ee
: BpPathenafee

b.

Provide laboratory services and technical assistance to all task

groups, to include:
(1) Provision of standard type film badges and specified supplement
ary items of personnel radiological safety equipment.

(2) Laboratory services to develop and interpret film badges.

(3) Records of exposures from film badges,

(Duplicates will be

furnished task group conmanders).
(4) Laboratory services for the radio-chemical analysis of water
samples,

;

(5) Provision of primary facilitics at PRRY ISL\ND radiological
safety building for calibration, repair and maintenance of instruments

e

Select target paragraph3