/ the direct optical system has been received in Los Alamos and will be operated checked out soon. 3) "JTF-7 Manual 61-1 (Draft), Operations and Reactivation Manual ," March 1961, DASA-70-03346. -F/ Cheese Notes that "when it became apparent that the moratorium would continue and that there was little likelihood that testing in the atmosphere would be resumed, the Proving Ground was placed ina caretaker status and finally transferred to the PMR for administration and use as a tracking station. The Joint Task Force was phased down and slated for eventual deactivation." Has personnel staffing of all JTF'’s since WWII. Has narrative descriptions of AEC, DOD, DASA, JTF, etc. and roles in nuclear testing. Details of moratorium thinking on JTF/DASA/EPG are quoted here: "As a result of the moratorium on nuclear weapons testing a study was made of the requirements for an organization for future test operations by a group representing JTF-7, DASA and the AEC. "The Report of the Study Group on the Organization for Future Test Operations" recommended that the staff of Joint Task Force SEVEN be reduced to a planning staff and that the EPG be placed ina standby status with a twelve month capability to resume testing. This study was approved and implementation was begun in the fal} eer le of [959.

Select target paragraph3