HetSt

$114 Million; $88 million
cost of GREENHOUSE totaled
ed
lat
umu
acc
The
ows:
foll
be summarized as
ms
the GREENHOUSEeffort can
es.’ The total capital ite
The magnitude of the cost of
urned to participating agenci
ret
or
s
ion
rat
ope
re
futu
items on hand to be used in
and $26 million of capital
n
represents operating cost,

the operatio
icipating agencies throughout
assets were returned to the part
tal
capi
of
ion
mill
6
$18.
ver, totaled $58.5 million;
furnished GREENHOUSE, howe
tity of
due to the fact that the detailed iden

cost,
cu rently included in the operational
operation, of which $12.6 million is
the
in
umed
cons
was
ion
mill
9
$13.
while

consumed in operation
to and reflected in detail in the
nt of $12.6 will be transferred
amou
this
ion
izat
item
cost
er
lable. Upon prop
these costs are not presently avai
.6 million; Air Force -- $1.8

on; Army -~ $2.0 million; Navy --$
on, The AEC contributed $9.5 milli
milli
9
$13.
to
$1.3
of
e
figur
ent
column increasing the curr
e -- $.008 million.
million and Civil Defens

ion
ion: Transportation - $9.5 mill
of aircraft by USAF - $15.6 mill
tion
fica
Modi
ows:
foll
as
d
refl ecte
GREENHOUSE operation are
mo Significant cost areas of the
unications operating
Commercial Transportation. Comm
by
d
ishe
furn
ion
mill
$.3
of
r
ion. The remainde
tributed $5.1 million, and MSTS $4.1 mill

"Oe Which MATS con

pment -- 30%;
transmitting and receiving equi
fixed station radio teletype
uded
incl
ch
whi
s
item
tal
capi
an additional $10 million of
%.
cost totaled $1.5 million, with
and maintenance equipment —-5

15%,
ipment -- 50%; power units -as and telephone back-up equ
radi
MP
,
pool
boat
as
such
tactical equipment,

11%; and Air Force -~43°:
37%; Army -- 9%; Navy -rtments as follows: AEC -depa
by
ted
ribu
cont
s
Ewa
effort in GREENHOUS
The $88 million of consumed
ining 42%,
Task Groups furnished the rema
ational effort including the
Oper
sCost
E
OUS
ENH
l GRE
contributed 58% of the fina
moved by
The experimental programs
273,492 tons and 13,575 passengers were
tons, and 26,646 passengers. A total of
42
275,3
d
totale
t
projec
SE
NHOU
~The logistical support of the GREE

transportation of these materials
Military Air Transport Service. The
the
by
d
move
were
rs
enge
pass
71
and 1,850 tons and 13,0
“the Military Sea Transport Service,
. At
air lift approximately 3 days
l by water;
from San Francisco to the Atol
required approximately 14 days
it
as
n,
atio
oper
nt
eme
mov
caused a planned and detailed

ated on Eniwetok Atoll.
e were 8,716 personne! loc
the peak of the operation ther

Select target paragraph3