PAGE 2 SURVEY SHOULD BE ACCOMPLISHED AS SOON AS POSSIBLE UPON COMPLETION OF THE NECESSARY PLANNING AND COORDINATION, IT SHOULD CONSIDER THE TOTAL ENVIRONMENT PERTINENT TO REHABILITATION INCLUDING BOTH EXTERNAL RADIATION DOSAGE AND BIOLOGICAL FOOD-CHAIN CONSIDERATIONS, IT IS ANTICIPATED THAT TECHNICAL STANDARDS AND REQUIREMENTS WILL BE PROVIDED BY RESPONSIBLE DIVISIONS WITHIN AEC HEADQUARTERS, IT IS UNDERSTOOD THAT PLANNING HAS BEEN INITIATZD BY DOS AND DEER IN COOPERATION WITH FIELD ORGANIZATIONS AND SUCH PLANNING WILL SERVE AS THE BASIS FOR A COMPREHENSIVE SURVEY PLAN. PARA, IN IMPLEMENTATING 1. THE ABOVE OBJECTIVE YOU ARE DIRECTED TO: PREPARE A PLAN FOR THE CONDUCT OF RADIOLOGICAL FIELD SURVEY AND ANALYSIS OF SAMPLES OBTAINED UTILIZING NECESSARY LABORATORY AND CONTRACTOR SUPPORT, 2. SELECT PERSONNEL NECESSARY TO CONDUCT THE FIELD SURVEY. 3. SELECT LABORATORIES AND PERSONNEL TO ACCOMPLISH THE NECESSARY LABORATORY WORK FOR ANALYSIS OF SAMPLES, THIS TASK INCLUDES ESTABLISHMENT OF PROCEDURES, STANDARDS , AND METHODS FOR CORRELATION OF DATA BETWEEN LABORATORIES, IN THIS CONTEXT YOU SHOULD PROVIDE FOR REVIEW AND REPORTING OF DATA, 4, SUPPORT PATHWAY AND DOSE ASSESSMENT ACTIONS WHICH WILL COME UNDER OVERALL TECHNICAL DIRECTION OF THE DBER, SUPPORTED BY THE DOS. 5. ARRANGE FOR NECESSARY LOGISTIC SUPPORT 6. COORDINATE LOGISTIC SUPPORT REQUIREMENTS WITH THOSE OF THE ENGINEERING SURVEY TO BE CONDUCTED CONCURRENTLY BY DNA, 7. DIRECT LIAISON WITH DNA IS AUTHORIZED, AS REQUIRED, KEEPING COGNIZANT AEC HEADQUARTERS DIVISIONS ADVISED.